ALSTOM Transport
- MPM10 (Montreal Metro) Rolling Stock Information Solution Project Manager
2011 - maintenantExpatriate in Canada
Information Solution Project Manager for Metro project of Montreal (50M€). Rolling Stock project (ALSTOM/BOMBARDIER) for delivery of 52 new trains.
- Responsible for the quality, cost and delay of the passenger annoucement, passenger information, CCTV, Automatic Train control and Traction command systems.
- Coordination of all work packages (WPs) to optimise the QCD (quality, cost, delay) performance of the project.
- Contribution to the improvement of the gross margin of the overall roling stock project.
- Multi-site and multidisciplinary ressource management.
- Cost, risk and savings management.
- Additional clause negotiation and claims management with the customer.
ALSTOM Transport
- Signaling Project Manager
2010 - 2011Signaling Project Manager for Tramway project of Constantine (20Meuros). Project Turnkey (JV ALSTOM/PIZZAROTTI)
- Responsible for the budget, time limit and quality of the project.
- Coordination of all work packages (WPs) to optimise the QCD performance of the project.
- Contribution to the improvement of the gross margin of the project.
- Multi-site and multidisciplinary ressource management.
- Cost, risk and savings management.
- Additional clause negotiation and claims management with the client.
ALSTOM Transport
- Signaling Project Manager
2009 - 2011Off-shore project manager for the signaling lot of MARMARAY project in Istanbul : responsible of the Quality, Cost an Delay.
Marmaray project is a metro line in Istanbul of 76km going under the Bosphorus. This is the first signaling project mixing ERTMS + CBTC system.
ASTOM Transport
- Signaling On-shore Project Technical Manager and Deputy of Project Manager
2007 - 2009Technical coordination and management for the signalisation of MARMARAY Project in Istanbul Turkey.
Deputy of on-shore project manager of Marmaray project. Coordination of activities and communication with consortium partnes, other contractors (civil works, rolling stock) and customer.
MARMARAY project is a metro project of 76km with 47 stations crossing the Bosphorus.;
I lived in Istanbul from august 2007 to december 2009.
ALSTOM Transport
- Automatic Train Control Manager Madrid Project
2005 - 2007Responsible of quality, cost and delay for design, development, installation, test and commissioning of Madrid Light Metro (Citadis).
I was based in France and managed teams in France, Brasil and Spain.
ALSTOM Transport
- Automatic Train Control Manager IncheonProject
2002 - 2007Responsible of quality, cost and delay for design, development, installation, test and commissioning of Incheon Metro (frist phase, from Incheon Airport to Gimpo Airport in Seoul).
I was based in France and managed teams in France, Brasil and Seoul.
LAM Research Corporation
- Intern as software engineer
DRAVEIL2001 - 2001Internship during 6 months in Freemont near San Francisco