11 years background in construction of plants including 7 years in the off-shore industry working on Green Field and Brown Field projects as Field Engineer and Manager of Fabrication, Hook-Up Works, and Packages Procurement.
After 4 years experiences in Nigeria as Hook-Up Manager and 2 years in UK as Fabrication & Packages Manager, I am presently working as Package Manager on West Nile Delta Project in Egypt.

Mes compétences :
Management de projet
Management d'équipe
Management opérationnel
Construction métallique
Tuyauterie Industrielle
Tuyauterie sous marine
Logistique et transport
hook up
operation marine
Construction

Entreprises

  • Subsea 7 - Package Manager

    SURESNES 2015 - maintenant Project Package Manager for West Nile Delta - Taurus & Libra Project (BP & Burullus - Egypt)

    Brownfield EPIC Package including:
    - Subsea Scope (36” Tie-In Spool, 4” MEG jumpers, Existing Valve integrity test)
    - Topside Scope (Main Umbilical Pull-In, 110 T Deck extension, new equipment installation, Tie-In and Commissioning).
  • Subsea 7 - Tender Lead

    SURESNES 2014 - 2015
  • Subsea 7 - Fabrication & Packages Manager

    SURESNES 2012 - 2014 Project Package & Fabrication Manager for Enochdhu Project (Conoco Phillips - Scotland):

    Project Package Manager based in London – Procurement of all components and services for the fabrication of the Bundle, towheads, Tie-In spools and associated installation aids (Budget: 22,000,000£).
    - Managing the project package engineers’ team.
    - Liaise with Supply Chain Management and Buyers
    - Managing subcontractors
    - Organising the Supply Chain and expediting of all components and services from the sub-contracts awards to the delivery as per projects requirements (Schedule, Quality and Budget).

    Project Fabrication Manager based in London – (2 of Towheads/Manifolds: 370T+267T & Subsea Spools: 86T – Mhrs:110,000 )
    - Managing the suppliers for the fabrication of Towheads/Manifolds & Subsea Tie-in spools – Structural piping and tubing Welding, NDT, PWHT, Coating, Insulation, Hydrotest, Pre-commissioning, Testing, Load out and Transportation.
    - Coordinating with the Design Team, Quality Inspectors, Specialist Engineers
  • Subsea7 - Fabrication & Hook-Up Manager

    SURESNES 2008 - 2012 Project Hook Up & Fabrication Manager for OSO RE & CPR Project (Exxon Mobil – Nigeria) since June 2010:

    Project Hook up Manager based in Lagos – OSO RR-RH-RE-RD&RB Risers & wellhead platforms Retrofit and upgrade (268 000 Mhrs /Shut down operations / Piping / Structural / E&I / PreCom Com)
    - Managing Mobilisation (Marine spread, Equipement and personnel mobilisation on 3rd party vessels,)
    - Managing Off-shore construction Operations (Marine Logistic, Equipments & Consummable supply chain, Personnel mob/demob, Incorporable Material Logistic)
    - Managing Subcontarctors (3rd party Vessels, NDT, Surveyors, Scaffolding/Painting, Flushing & Leaktesting)
    - Managing material reconcialiation and on-shore logistic.
    - Managing Hook up Operation preparation (Bag & Tag, Equipment set up, Store constitution, Personnel qualification)
    - Client relashionship (Lead Weekly meeting, MOM, Weekly report,..) .
    - Assist the project and contract manager to develop and issue change proposals

    Project Fabrication Manager based in Lagos – (Risers & Subsea Spools: 134 T / Structural: 131 T / Piping: 130 T / Mhrs: 158 000 Mhrs)
    - Organizing the fabrication of CRA Risers & Subsea spools, Riser gards, Topsides Structure, Topsides Spools (CRA, CS, Duplex & SS) – Welding, NDT, PWHT, Coating, Vulcanization, Hydrotest,…)
    - Managing two fabrication teams (Fab rep + QC + Mat track) on two different yards in Nigeria ( Globestar in Warri, and Grinaker in Port Harcourt)
    - Put in place in emergency a work force team to fabricate installation aids (50T) and integrate it on construction barge to arm it for critical operations
  • Veolia Environmental Services - Project Engineer

    2004 - 2008 Management of construction, revamping, normalisation and destruction projects of waste treatment unities:

    - Revamping of the Waste Incinerator of Brest (150000Te of waste a year/ 1 Turbo-alternator 9Mwatt / 1 heat exchanger for urban heat) - Budget:16M€

    - Construction of a new Industrial Waste Recycling Unit (120000Te of waste/year) – Budget: 2M€

    - Revamping of the Smoke Treatment Sytem of the Waste Incinerator of Montreau (50000Te of waste/year) - Budget: 250000€

    - Installation of Security & Safety sytems to control access and to prevent fire on 26 Parisian Units - Budget: 6M€

Formations

  • Ecole Supérieure De Commerce De Montpellier ESC (Montpellier)

    Montpellier 2003 - 2004 MBA
  • ESIEA

    Paris 1999 - 2003 Ingénieur

Réseau